— Phase-One Deliverables

Infrastructure Built to Smart-City Specification

Every amenity listed here is a civil commitment in the project's phase-one schedule — verified timelines, not deferred additions.

/ Engineered Community Infrastructure

Twelve Amenities. Zero Deferrals.

▸ Entry Infrastructure
▸ Road Network
▸ Lighting Grid
▸ Perimeter Security

Grand Entrance Gate

Wide Internal Roads

LED Street Lighting

CCTV Surveillance

Monumental gated entry aligned to Vaastu cardinal axis, with 24-hour guard post and ANPR-ready lane configuration.

30-ft and 40-ft wide asphalted internal roads with paved shoulders, storm-drain integration, and clear turning radii.

Solar-assisted LED poles at 20-metre intervals across all internal roads and common zones, phased with road completion.

Full-perimeter IP camera network with central monitoring, recorded feeds, and conduit provisioned for future AI analytics.

▸ Utilities
▸ Power Infrastructure
▸ Community Hub
▸ Wellness Circuit

Water Supply Network

Underground Electricity

Clubhouse Facility

Jogging Track

Underground pressurised water distribution with individual plot connections and overhead tank backup at common nodes.

Concealed HT/LT cabling per DGVCL smart-city norms, with dedicated transformer bays and fibre-ready conduit runs.

Purpose-built multi-function clubhouse positioned at the development's geometric centre per Vaastu proportion ratios.

Anti-skid paved perimeter jogging circuit with landscaped buffer zones and rest nodes at quarter-circuit intervals.

▸ Green Infrastructure
▸ Children's Zone
▸ Spiritual Precinct
▸ Open Spaces

Landscaped Gardens

Children's Play Area

Temple Area

Green Open Zones

Formally planned green corridors and garden precincts aligned to Vaastu cardinal directions, native species, and drip irrigation.

Dedicated soft-surface play precinct with age-appropriate equipment, boundary fencing, and direct sightlines from the clubhouse.

Vaastu-oriented temple precinct sited at the northeast quadrant of the master grid, with dedicated approach path and open courtyard.

Minimum 15% of total land reserved as green open space per SIR development code, distributed across the plot matrix.

— Smart-City Grade Specification

Underground. Fibre-Ready. Delivered in Phase One.

Utilities are not amenities. Water, power, drainage, and data conduit are engineered below grade — invisible by design, permanent by specification.

Underground Utilities

Fibre-Ready Conduit

CCTV Perimeter Grid

Water, electricity, and drainage routed below grade per Dholera SIR smart-infrastructure code. No overhead wiring within the development boundary.

Dark fibre conduit pre-installed to every plot boundary, enabling high-speed connectivity provisioning without civil disruption post-handover.

IP-based full-perimeter surveillance with redundant recording infrastructure. Conduit provisioned for future integration with Dholera's city-wide command centre.

Verify the Infrastructure in Person

Site visits are available Mon–Sat. Walk the civil works, review the master plan, and confirm every specification listed here against on-ground progress.